Foundation

Methods

  • Trench leveling with small stones before concrete
  • Plain cement concrete (PCC) blinding layer for a firm base
  • Masonry steps to correct unlevel sections and keep loads transferring vertically

Materials

  • Small stones for trench leveling
  • Plain cement concrete (PCC) — used sparingly, confined to wall lines where possible
  • Locally sourced stone for the leveling steps

With excavation complete, the trenches were prepared for the stone foundation to sit on. Excavated boulders and murum were carefully stored aside rather than hauled away — material saved for later reuse.

Trench bottoms leveled with small stones before the PCC pour

The trench bottoms were first built back up to level with small stones, then washed clean and topped with a layer of plain cement concrete (PCC) — a firm, even base for the stone masonry above. Concrete use was meant to stay confined to the wall lines; for the smaller rooms the floor area also got covered, an avoidable wastage noted here for transparency.

PCC layer poured across the foundation trenches, with excavated boulders and stones stored aside in the background

Some sections of the PCC came out sloped rather than level. Instead of breaking and repouring, masonry steps were built over the sloped sections — carrying the load straight down instead of at an angle, and avoiding the risk of stones slipping sideways.

See the journal entry for the full write-up, including a video of the correction.

Lessons Learned

  • Store excavated boulders and murum on-site for reuse — nothing wasted
  • Mark wall lines clearly before pouring PCC so it isn't spread under full room floors unnecessarily
  • Check the PCC surface for level before it cures — correcting a slope afterward means building up with masonry steps rather than a clean pour